Mainland China office fit-out · Master programme

A native .mpp for a China office fit-out master programme.

Not a generic PM skill. Not an Excel template.

Construction Bureau permit filing, drawing review, D&B vs DBB, and a construction calendar vs a statutory-holiday calendar — encoded in the critical path.

Free sample: PDF · 8 pages · 42 KB · no email required. Preview only, not the paid Skill zip. Product Hunt, 1 Sep 2026

Prefer a human? Schedule clinic, 30–40 minutes, $79

Promo trailer, 24 s, muted. See the sample programme

Who it’s for

Teams already using Cursor + Microsoft Project.

This is not a generic Gantt template. It is an instruction file that directs the agent, plus an engine that encodes permit rules, trade sequences and CPM for mainland China office fit-out.

Office fit-out Lead PMs

Running a mainland China office fit-out from permit filing through move-in.

Design-build teams

Contractors and consultants who need the tender route and trade sequence in one file.

PMOs on Cursor + Microsoft Project

Teams that already schedule in Project and want the agent to draft the baseline.

What you get

Skill, city rules, four WBS packs, calendars, IAQ, .mpp.

Delivered as a 133 KB zip on Gumroad. This website is a marketing preview — it does not download SKILL.md or run the engine.

SKILL.md

The instruction file the Cursor agent follows in three steps: permit compliance, WBS trade sequence, then CPM and write to disk.

City permit library

Filing steps and lead times for Hangzhou, Shanghai, Beijing, Shenzhen, Suzhou, Chengdu and Wuhan. Unlisted cities fall back to a national default rule set.

Four WBS packs

Design-build or design-bid-build, each with an invited or public tender route. Pick one and the trade sequence and tender lead time follow.

Dual calendars

A construction calendar for site trades and a general calendar for permits, design and tender, with statutory holidays and the Spring Festival shutdown built in.

Two IAQ SOP gates

Two indoor air-quality test gates on the critical path, plus the furniture delivery window they constrain.

Native .mpp on Windows

A Python engine writes a native Microsoft Project .mpp from the command line. Open it in Project, no import step.

Sample programme

Switch D&B / DBB and public / invited tender.

A static, interactive preview of a mainland China office fit-out master programme: WBS, CPM-style bars, dual calendars and two IAQ SOP gates. Switch between the four WBS packs and the city permit library. Durations are illustrative, not engine output.

Sample master programme

Grade-A office fit-out preview

Static Gantt rendered in the browser, not the paid Python engine.

Preview only
Contract
Tender

Design-build, invited tender. Permit library: Shanghai. Bars and day counts are an on-page illustration, not engine output.

TradesPermitsTenderIAQ SOP gatesCritical / furnitureCPM links
WBS
W1
W2
W3
W4
W5
W6
W7
W8
W9
W10
W11
W12
W13
W14
W15
W16
W17
W18
W19
W20
W21
W22
W23
W24
W25
W26
W27
W28
W29
W30
W31
W32
W33
W34
W35
W36

Task

MEP first fix

Site trades

Calendar

Construction calendar

Site working days; Spring Festival shutdown

Window

D81–D104

Critical path

Free sample

FREE SAMPLE · PREVIEW ONLY

Take the sample programme with you. Free PDF, no email.

An 8-page static export of the interactive demo above: all four WBS packs as Gantt pages, a milestone comparison, and the dual-calendar and IAQ SOP gate logic explained. One click, direct download.

PDF · 8 pages · 42 KB · no email required.

Inside the PDF

  • How the six WBS phases, two calendars and two IAQ SOP gates fit together.
  • One Gantt page per WBS pack: D&B / DBB × invited / public tender, with the critical path marked.
  • A side-by-side milestone table showing where the four packs diverge.
  • What the paid Skill adds, what you still need, and what is not included.

What it is not

  • Not the paid Skill zip: no SKILL.md, no Python engine, no .mpp file.
  • Durations are illustrative and match the on-page demo. They are not engine output for any real city or floor plate.

Schedule clinic

HUMAN TIME · NOT A DOWNLOAD

Schedule clinic — $79

30–40 minutes on your lookahead vs the master programme. Three actions you can take this week. Human time, not a file download.

Booking and payment happen on Gumroad.

Clinic — $79 USD

30–40 minutes of human time on your lookahead vs the master programme. You leave with three actions for this week. Nothing to download.

Skill — $99 USD

The Skill (China office fit-out → native .mpp) is separate, $99, if you want it after. Buy on Gumroad

You still need

Cursor, Windows, Project, Python.

  • Cursor

  • Windows

  • Microsoft Project desktop (skip if you only need durations, not a .mpp)

  • Python 3.8+ (for .mpp export)

After purchase, put the folder at %USERPROFILE%\.cursor\skills\pmp-lead-pm-scheduler\. SKILL.md must sit at the top of that folder. Restart Cursor, then tell the agent: city, floor area, budget, D&B or DBB, invited or public tender, and the start date or move-in date.

Not included

A schedule aid, not a licence.

  • Does not replace a licensed architect, cost engineer or permit filing specialist.

  • Does not guarantee every city’s latest policy. Rules change; have a professional review the schedule.

  • No .mpp write on macOS, or on Windows without Project installed.

Get the native .mpp

One-time on Gumroad. This site does not host the zip.

$99 USD, one-time. Purchase and download happen on Gumroad.

Refunds are available within 7 days if the zip is corrupt or the documented install path fails to run on Windows with Microsoft Project installed.